 |
| The Flinterland arrived Duluth on August 27th, 2008 and began loading a cargo of wind turbine blades for Brazil. She replaced the BBC Plata at Berth 1. The Plata, behind the Flinterland, had just completed discharging wind turbine parts and was preparing to depart the port. |
|
|
 |
| The above piece, a 405 ton containment vessel loaded in Kobe, Japan, was taken off the Daniella on Sunday, August 3, 2008. It was placed onto a special double rail car that will shortly leave for a ConocoPhillips refinery project in Billings. It is a hydro treatment reactor, a pressurized vessel that, along with high temperatures and an added catalyst, can extract sulfur from crude oil, providing a cleaner end product. Carl Siroky, the project manager for ConocoPhillips in Billings, was in town overseeing the cargo transfer. He described it as an EPA (Environmental Protection Agency) regulation driven project. Above, it is seen on Tuesday evening, August 5th after it was pulled from the dock at Lake Superior Warehousing. It is expected to depart Duluth for Billings on Thursday. |
|
 |
| The Daniella (above) started to discharge a cargo of container vessels destined for Alberta on August 2nd, 2008. The BBC Maine (below) arrived the same day with a cargo of wind turbine parts built by Siemens in Denmark. |
 |
|
|
 |
| The
Marlene Green arrived
Duluth on
June 29th, 2008 at 10:53 am. |
|
|
 |
| The tug Margot and barge Lockwood 1000 sit at the Port Terminal on Wednesday night, June 25th, 2008. The next day, the cargo on the barge was discharged. (more) |
|
|
 |
| The BBC Elbe arrived in Duluth on Thursday morning June 19th, 2008, with a cargo of wind turbine parts. Above, she is backing into the slip at the Port Terminal where she began discharging her cargo very soon after arriving. (more) |
|
|
 |
| The BBC Ontario came into port on June 13th. Longshoremen at Lake Superior Warehousing began discharging 11 component sets (minus blades) of Siemens wind turbines loaded in Denmark the next day. (more) |
|
|
 |
| The
Liamare discharged a cargo of wind turbine parts built by Gamesa in Spain on June 2nd, 2008. (more) |
|
|
 |
| A nacelle is lifted from the cargo hold of the Asiaborg onto a truck on Friday evening, May 10th, 2008. (more) |
|
|
 |
| The BBC Zarate brought the first cargo to Lake Superior Warehousing Co, Inc for the 2008 season. She came under the Lift Bridge at 6:13 in the morning and is seen above approaching the ship at the Port Terminal. Cargo discharge began at 8 am. (more) |
|
|
 |
 |
The Beluga Energy (left) and the BBC Ontario (right) closed out Lake Superior Warehousing's 2007 cargo ship activity. The Beluga Energy discharged wind turbine pieces from Spain. They will be taken by truck to North Dakota. The BBC Ontario arrived Duluth on December 1st to first load beet pulp pellets and then wind turbine blades, both cargos coming to Duluth from North Dakota. Both cargos were taken to Spain. More on the Beluga Energy. More on the BBC Ontario. |
|
|
 |
| On Sunday, August 12, 2007, the last wind turbine blades were placed on the Beluga Expectation. She left later that day for Spain. Above, a trailer truck from B & K Trucking of Marathon, Wisconsin is ready to back one of the 25 blades next to the ship. It was loaded onto a lower deck; five blades were later loaded onto the weather deck. |
|
|
 |
| Longshoremen
at Lake Superior Warehousing work to load a nacelle from the S.Pacific
onto a waiting trailer on Friday evening, June 22, 2007. |
|
|
| Mid-America's
Gateway to the World, Minnesota's World Port has heavy lift capabilities
of 81 metric tonnes per crane (approximately 125 metric tonnes in tandem).
The
Clure Public Marine Terminal lies inside one of the greatest natural harbors
in the world.
There are
seven berths available (6,600 lineal feet of dock space) at full Seaway
draft (8.23 meters = 27 feet). Generous
clearances allow truck and rail transport of "high~wide" shipments
to or from points throughout North America.
Four railroads
(BN, CN, CP and the UP), an interstate highway system, and a score of
motor carriers make the Port of Duluth an energetic transportation center
in the heart of North America.
|
| for
more information, contact:
Lake Superior Warehousing Co., Inc. |
 |
| Jonathan
Lamb, Vice President, Operations
jonathan.lamb@lswci.com
Jason Paulson, Operations Manager
jason.paulson@lswci.com
Denise
McDougall, Warehouse Coordinator
Denise.McDougall@lswci.com
Ruth
Delich, Office Assistant
Ruth.Delich@lswci.com
Brian
Granholm, Jr., Logistics Coordinator
Brian.Granholm@lswci.com
1210
Port Terminal Drive
Duluth, Mn 55802
(218) 727-6646
Fax: (218) 727-6649
©
2008 Lake Superior Warehousing Co., Inc. |
|
| |
..................